. Identified and assessed all jobs in related project activity with potential safety hazards.
• Stop & report immediately and any anomaly, violation & unsafe practice to Lead HSE and CSR
• Attend and participate in daily Tool Box Talks and Pre-Job Safety Meetings.
• Participate in the regular HSE coordination meeting with CTR.
• Advise and monitor the daily activity of contractors on the on-site project
• Ensure all HSE Program contractors are implemented as well during the project on-site
• Monitor all activity to follow the company role and implement as well
• Advice and supported team management
• Advised contractor to ensure the HSE program incentive is implemented in on-site operations.
• Review all safety risk assessments and Job Safety analyses (JRA, JSA)
• Making sure that all workers know the location of the muster station.
• Keep monitoring daily and record the number of temperatures
• Carrying out safety inspections and safety walkabouts
• Arranging for the removal of hazardous waste and materials.
• Carrying out area safety inspections.
• Maintaining accurate administrative records of any emergency drills carried out.
• Maintaining statistical records of all reported incidents and accidents.
• Promote HSE recognition and awareness to all employees, contractors, and subcontractors.
• Carry out inspection, scaffolding erection, and dismantling at the work site (join inspection with the Supervisor scaffolder)
• Conduct HSE Induction to personnel at the barge project
• Manage PTW (HOT work and Cold work) all activities between the project to OIM operation (SIMOPS activity)
• Advice to CTR to keep conducting drill exercises as referred to the HSE Plan.
• Implementation of HSE Audit Management System
• PTW review and check implementation in the field and PTW Audit
Pengalaman
January 2022 – September 2025
PT. MedcoEnergi EP Natuna Ltd. Senior HSE Inspector / HSE Supervisor PROJECT DEVELOPMENT PROJECT
(BEP project, Bronang Gas Expansion Project, and Terubuk Project)
Location:BATAM- Kepulauan Riau and Offshore Natuna Sea.
Scope of Project:
➢ Fabrication Jacket WHP, Topside, and Pre-comm
➢ Installation Jacket and Topside and HUC-Up (T&I) Offshore, Commissioning
➢ Load out of Module Jacket and Topside
➢ Installation Pipeline, PLEM, and RISER
Pendidikan
Education:
Polytechnic Company Leadership – APP (Department Perindustrian RI) – on behalf of the Department of Industry of the Government from August 2001 to December 2004 GPA= 2.93
Graduate Diploma in Production Management