beBee background
Profesional
>
Teknik / Arsitektur
>
Tangerang
kris windardjanto

kris windardjanto

Kris windardjanto
Tangerang, Provinsi Banten
(0)

Sosial


Tentang kris windardjanto:

 Iam 53 years old  and  Industrial engineering degree 

 Iam experience at MEP project (High rise building,Data center,Apartment,Office Building,Retail building,mall building,Hotel,Industrial project)

Pengalaman

June 2022 TO Present

POSITION MANAGERM & E

COMPANY : GEREJA KEMAH TABERNAKEL PIK 2

PROJECT : GEREJA KEMAH TABERNAKEL PIK 2

 

JOB DESCRIPTION :

 

  • CONTRACT REVIEW
  • DESIGN REVIEWS,VALUE ENGINEERING
  • DESIGN VERIFICATION & VALIDATION RECORDS
  • DESIGN CHANGES
  • THE PROJECT PLAN
  • ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
  • CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
  • METHODE STATEMENTS MEP
  • INSPECTION & TEST PLANS MEP
  • MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
  • INSPECTION REPORT MEP
  • COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
  • COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
  • MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
  • CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
  • MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
  • TESTING & COMISSIONING DATA
  • VALIDATION REPORTS
  • QUALIFICATION REPORTS
  • AUDIT REPORTS
  • QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
  • INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
  • INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
  • DAILY REPORT OF QUALITY ACTIVITAS
  • PERIODE QUALITY RECORDS
  • QUALITY COST REPORTS
  • SAFETY REPORTS
  • MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
  • AS BUILT DRAWING
  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING

 

  • REPORT TO GM Project
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 Play,chiller,escallator

 

MARCH 2021 TO SEPTEMBER  2021

POSITION COORDINATOR M &E

COMPANY : PT. TATA MULIA NUSANTARA INDAH

PROJECT : MONDELEZ INTERNATIONAL (FACTORY)

 

JOB DESCRIPTION :

 

  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
  • PREPARING PROJECT PROGRESSREPORT AND BILLING
  • PREPARING PROJECT HAND OVER AND DOCUMENTATION

 

  • REPORT TO PROJECT MANAGER
  • Scope MEP

Electrical,Electronic (CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing (Clean water,Waste water,Hot water, ,Rain water ) FireProtection,WWTP,Compressor system,water cooled chiller,Lift,

Cold storage system


 

October 2016 TO February2021 POSITION MANAGER M & E

COMPANY : PT. BREWINMESA SUTERA

PROJECT : THE LANA APARTMENT

 

JOB DESCRIPTION :

 

  • CONTRACT REVIEW
  • DESIGN REVIEWS,VALUE ENGINEERING
  • DESIGN VERIFICATION & VALIDATION RECORDS
  • DESIGN CHANGES
  • THE PROJECT PLAN
  • ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
  • CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
  • METHODE STATEMENTS MEP
  • INSPECTION & TEST PLANS MEP
  • MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
  • INSPECTION REPORT MEP
  • COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
  • COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
  • MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
  • CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
  • MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
  • TESTING & COMISSIONING DATA
  • VALIDATION REPORTS
  • QUALIFICATION REPORTS
  • AUDIT REPORTS
  • QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
  • INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
  • INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
  • DAILY REPORT OF QUALITY ACTIVITAS
  • PERIODE QUALITY RECORDS
  • QUALITY COST REPORTS
  • SAFETY REPORTS
  • MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
  • AS BUILT DRAWING
  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING

 

  • REPORT TO GM Project
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 PLAY

 

 

 

 

 

 

 

 

 

October 2013 TO October2016

POSITION CONSTRUCTION MANAGERM & E

COMPANY : PT. Adhi Persada Properti

PROJECT : GRAND DHIKA CITY BEKASI TIMUR

 

JOB DESCRIPTION :

 

  • CONTRACT REVIEW
  • DESIGN REVIEWS,VALUE ENGINEERING
  • DESIGN VERIFICATION & VALIDATION RECORDS
  • DESIGN CHANGES
  • THE PROJECT PLAN
  • ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
  • CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
  • METHODE STATEMENTS MEP
  • INSPECTION & TEST PLANS MEP
  • MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
  • INSPECTION REPORT MEP
  • COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
  • COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
  • MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
  • CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
  • MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
  • TESTING & COMISSIONING DATA
  • VALIDATION REPORTS
  • QUALIFICATION REPORTS
  • AUDIT REPORTS
  • QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
  • INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
  • INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
  • DAILY REPORT OF QUALITY ACTIVITAS
  • PERIODE QUALITY RECORDS
  • QUALITY COST REPORTS
  • SAFETY REPORTS
  • MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
  • AS BUILT DRAWING
  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING

 

 

  • REPORT TO Project Director
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift.

 

 

 

 

 

 

 

MARCH 2011 TO AUGUST2013

POSITION M & E MANAGER

COMPANY : PT. JAKARTASETIABUDI INTERNATIONAL Tbk

PROJECT : SETIABUDI SKY GARDEN APARTMENT

 

JOB DESCRIPTION :

 

  • CONTRACT REVIEW
  • DESIGN REVIEWS,VALUE ENGINEERING
  • DESIGN VERIFICATION & VALIDATION RECORDS
  • DESIGN CHANGES
  • THE PROJECT PLAN
  • ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
  • CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
  • METHODE STATEMENTS MEP
  • INSPECTION & TEST PLANS MEP
  • MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
  • INSPECTION REPORT MEP
  • COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
  • COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
  • MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
  • CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
  • MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
  • TESTING & COMISSIONING DATA
  • VALIDATION REPORTS
  • QUALIFICATION REPORTS
  • AUDIT REPORTS
  • QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
  • INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
  • INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
  • DAILY REPORT OF QUALITY ACTIVITAS
  • PERIODE QUALITY RECORDS
  • QUALITY COST REPORTS
  • SAFETY REPORTS
  • MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
  • AS BUILT DRAWING
  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING

 

 

  • REPORT TO PM
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,

 

 

 

 

 

 

 

July 2010 TO Dec 2010

POSITION PROJECT ENGINEERING COMPANY : PT. E.K PRIMA

PROJECT : LULU HYPERMARKET

 

JOB DESCRIPTION

 

  • TECHNICAL SPECIFICATION REVIEW AND RESOLUTION IN PROJECT
  • COORDINATION THE COLLECTION AND DISSEMINATION OF TECHNICAL INFORMATION BETWEEN/WITHIN THE COMPANY AND CONSUMER
  • SCHEDULE AND MONITORING PROGRAM ACTIVITY TO ACHIEVE AN”ON-
  • TIME”RESULT INCLUDINGFOLLOW UP WITH EXTERNAL SUPPLIERS TO ENSURE TIMELY RESPONSE TO ACTION ITEMS
  • MONITORING PROGRAM COST ACTIIVITY TO ACHIEVE AN “IN BUDGET” RESULT
  • PREPARE QUATATIONS UTILIZING SUPPLIER INFORMATION,COST STANDART,TECHNICAL INFORMATION FROM QUALITY,MANUFACTURING ENGINEERING DESIGN
  • ENSURE THAT PROJECTCHARGER ARE CORRECTLY REPRESENTED FOR ACCOUNTING’SCLOSING PROCESS
  • PERFORM WORK WHICH INVOLVES CONVENTIONAL METHODS AND TYPE OF PLAN,INVESTIGATIONS,SURVEY,STRUCTURES,OR EQUIPMENTS WITH RELATIVELY FEW COMPLEX FEATURES
  • SELECT AND RECOMMENDS PROCEDURES OR DEVELOPMENT OF METHODS
  • ASSISTS IN THE COORDINATION OF PRICING,ESTIMATING,SCOPING,STRATEGIES FOR PROPOSEDPROJECTS AND IN THE DEVELOPMENT AND PREPARATION OF TECHNICAL SPECIFICATIONS
  • PREPARE DESIGN,DRAWINGS,PLANS AND SPECIFICATIONS FOR PROJECT,ENGINEERING SYSTEM,TECHNICAL EQUIPMENT OR COMPONENTS
  • SUPERVISES TECHNICAL TESTING,SURVEY OR FIELD ENGINEERING TEAM
  • ASSISTS IN CLIENTCONTACT AND COMUNICATION PERTAINING TO SPECIFIC PROJECTS
  • ASSISTS IN PREPARATION OF PROBABLE CONTRUCTION COST ESTIMATES
  • PREPARE DESIGN COMPUTATIONS AND QUANTITY ESTIMATES
  • ASSISTS IN THE PREPARATION OR MODIFICATION OF REPORTS,SPECIFICATIONS,PLANS,CONSTRUCTION SCHEDULLE,ENVIROMENTAL IMPACTSTUDIES,PERMITS AND DESIGNSFOR PPROJECT
  • INSTRUCT TECHNICIANS TO REDUCE DESIGNSTO WORKING DRAWINGS
  • REVIEWS AND MONITORSPROJECT PROGRESS TO ASSURE QUALITYAND ADHERENCE TO REQUIREMENTS OF CONTRACT DOCUMENTS
  • RECEIVES INSTRUCTIONS ON ASSINMENT OBJECTIVES,COMPLEX FEATURES AND POSSIBLE SOLUTIONS
  • RECEIVES/SOLICITSGUIDANCE ON USUAL AND/OR COMPLEXPROBLEMS AND SUPERVISORY APPROVAL ON WORK PLANS

 

  • REPORT TO PM
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator,Showcase,Frozen

Chiller room and Cool Stored,server ,Serverroom,cashier register

 

 

 

 

 

 

 

 

 

SEPTEMBER 2007 TO JUNE 2010

POSITION QUALITYASSURANCE MANAGER and MANAGER MEP COMPANY : PT. MELAWAI JAYA REALTY

PROJECT : BLOK M SQUARE

 

JOB DESCRIPTION :           

 

  • CONTRACT REVIEW
  • DESIGN REVIEWS,VALUE ENGINEERING
  • DESIGN VERIFICATION & VALIDATION RECORDS
  • DESIGN CHANGES
  • THE PROJECT PLAN
  • ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
  • CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
  • METHODE STATEMENTS MEP
  • INSPECTION & TEST PLANS MEP
  • MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
  • INSPECTION REPORT MEP
  • COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
  • COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
  • MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
  • CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
  • MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
  • TESTING & COMISSIONING DATA
  • VALIDATION REPORTS
  • QUALIFICATION REPORTS
  • AUDIT REPORTS
  • QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
  • INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
  • INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
  • DAILY REPORT OF QUALITY ACTIVITAS
  • PERIODE QUALITY RECORDS
  • QUALITY COST REPORTS
  • SAFETY REPORTS
  • MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
  • AS BUILT DRAWING
  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONSAND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING

 

 

  • REPORT TO COO
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Fire Alarm,MATV,Tlp,Public adress)CHILLER HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator

 

 

 

 

 

 

 

 

 

MARCH 2006 TO SEPTEMBER 2007 POSITION PROJECT MANAGERM & E

COMPANY : PT. PRASETYAGEMA MULIA (FIT OUT PROJECT)

 

JOB DESCRIPTION :

 

  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
  • PREPARING PROJECT PROGRESSREPORT AND BILLING
  • PREPARING PROJECT HAND OVER AND DOCUMENTATION

 

  • REPORT TO DIRECTOR

Project : Wisma Bakrie,Tomen,XL Braga,BI,XL Pondok indah,Rosso

,Shangrilla,Tawan restaurant,Danamon,Minshare,Bellagio food court,Belleza,Prasetya Mulya,BP,Ceo Pacific Place,Indo Food,Danone,Carbon Capital,DATA CENTER

  • Scope MEP (FIT OUT MEP SUPORT TO VIVERE)

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data centre,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP ) FireProtection,DATA CENTER

 

MARCH 2004 TO MARCH 2006 POSITION COORDINATOR M &E

COMPANY : PT. MITRAPRIMA SEJAHTERA

PROJECT : PURI GARDEN APARTMENT

 

JOB DESCRIPTION :

 

  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAW
  • PREPARING PROJECT PROGRESSREPORT AND BILLING
  • PREPARING PROJECT HAND OVER AND DOCUMENTATION

 

  • REPORT TO PROJECT MANAGER
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift

 

 

 

 

 

 

 

 

 

MARCH 2003 TO DECEMBER 2003   POSITION COORDINATOR M & E COMPANY : PT. DECORIENT

PROJECT  : SAMPOERNA 

 

JOB DESCRIPTION :

 

  • PROJECT SITE MANAGEMENT AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
  • PREPARING PROJECT PROGRESSREPORT AND BILLING
  • PREPARING PROJECT HAND OVER AND DOCUMENTATION
  • REPORT TO PROJECT MANAGER
  • Project : SampoernaProject Sukorejo Pandaan
  • Scope MEP

      Electrical,Electronic (BAS,CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing  (Cleanwater,Waste water,Hot water,STP,Rain water ) FireProtection,Genset,WWTP

 

APRIL 2002 TO MARCH 2003                  POSITION MANAGERENGINEERING

  COMPANY : PT. ALUPRIMA PACIFICINDUSTRIES

  PROJECT : ALUMUNIUM EXTRUSION CIKANDE

 

JOB DESCRIPTION :

 

  • PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT 
  • REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY INDUSTRIES
  • SAVING ENERGY PROGRAMAND UTILITY
  • COORDINATION CROSS DEPARTEMENT
  • IMPROVEMENT PROGRAM ( ZERO BREAK DOWN PROGRAM)
  • MODIFICATION MACHINERY EXTRUSION,MELTING,ANODAIZING,OVEN ALUMUNIUM,COOLING TOWER

 

  • REPORT TO PLAN MANAGER

 

AUGUST 1999 TO APRIL 2002 POSITION CHIEF ENGINEERING

COMPANY : PT. CARREFOURINDONESIA

 

JOB DESCRIPTION :

 

  • PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT,ENGINEERING
  • REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY STORE
  • SAVING ENERGY PROGRAMAND UTILITY
  • COORDINATION CROSS DEPARTEMENT
  • PREVENTIVE MAINTENANCE PROGRAM
  • ANNUAL BUDGETING COVERINGCOST LABOUR,UTILITY,SPARE PART AND MAINTENANCE CONTRACT
  • ASSET MANAGEMENT INVENTORY
  • SUPORT SALES DEPARTMENT
  • PROJECT ENGINEER SETTING NEW PROJECT CARREFOUR 
  • REPORT TO STORE MANAGER CARREFOUR DUTA MERLIN

 

AUGUST 1995 TO AUGUST 1999 POSITION PROJECT ENGINEERM E COMPANY : PT. BERCA INDONESIA

 

JOB DESCRIPTION :

 

  • PROJECT SITE MANAGEMENT,ENGINEERING AND ADMINISTRATION
  • PROJECT SCHEDULLING AND IMPLEMENTATION
  • MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
  • ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
  • DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
  • CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
  • PREPARING PROJECT PROGRESSREPORT AND BILLING
  • PREPARING PROJECT HAND OVER AND DOCUMENTATION
  • COORDINATION SUBORDINATES AND SUBCONTRACTOR TO ACHIEVE THE PROJECT SCHEDULLE

 

  • REPORT TO PROJECT MANAGER
  • Project : Wisma Indograha,Anker Bier,Menara 7 Gading Apartement,Permata Berlian Condominium,Carrefour Duta merlin
  • Scope MEP

Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public      adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator

 

 

SEPTEMBER 1993 TO AUGUST1995

POSITION PROJECTENGINEER MECHANICAL 

COMPANY : PT. GADJAH TUNGGAL

PROJECT : GADJAH TUNGGAL JATAKE

 

JOB DESCRIPTION :

 

  • SETTING AND INSTALLATION MACHINERY INDUSTRIES,ENGINEERING
  • PROJECT TECHNICAL SUPORT,PERFORMING SITE INSTALLATION AND MAINTENACE MACHINERIES
  • CONTROLLING MATERIAL DELIVERY,CONSUMPTIONS AND WITHDRAWALS
  • PROJECT ESTIMATION,CONSTRUCTION,DESIGN PLAN SPECIFICATION
  • PROJECT DOCUMENTATION AND REPORTING
  • PROJECT COST CONTROL
  • COORDINATION SUBORDINATES AND SUB CONCRACTOR TO ACHIEVE 

 

  • REPORT TO PROJECT MANAGER

 

Pendidikan

Polytechnic Gadjah Tunggal major Industrial Engineering  degree 1993

Profesional dari sektor Teknik / Arsitektur yang sama dengan kris windardjanto

Profesional dari berbagai sektor di dekat Tangerang, Provinsi Banten

Pengguna lain yang disebut kris

Pekerjaan di dekat Tangerang, Provinsi Banten

  • BASF SE

    QA Manager, ED

    Ditemukan di: beBee S2 ID - 5 hari yang lalu


    BASF SE Jakarta, Indonesia

    Objectives: · Overseas the activities in the QC and Process Laboratories. · Coordinates and controls the quality management activities in the Polymer Dispersion Plant (PDP). · Main Tasks: · Supervise the release of raw materials and finished products. · Supervise the implementati ...

  • Michael Page Indonesia

    Investment Associate

    Ditemukan di: beBee S2 ID - 5 hari yang lalu


    Michael Page Indonesia Jakarta, Indonesia Waktu penuh

    About Our Client Our client is a leading investment institution established for the development through strategic investments with coverage both of domestic and international. · Job DescriptionReview and/or create financial models based on potential transaction structures. · Ide ...

  • Michael Page Indonesia

    Marketing Manager

    Ditemukan di: beBee S2 ID - 3 hari yang lalu


    Michael Page Indonesia Jakarta, Indonesia Waktu penuh

    About Our Client Our client is an established global pharmaceutical company, that highly value advancement in state-of-art technology. They have extensive portfolio in ethical products as well as consumer health and constantly develop new products over the years, covering high-de ...