Tentang kris windardjanto:
Iam 53 years old and Industrial engineering degree
Iam experience at MEP project (High rise building,Data center,Apartment,Office Building,Retail building,mall building,Hotel,Industrial project)
Pengalaman
June 2022 TO Present
POSITION MANAGERM & E
COMPANY : GEREJA KEMAH TABERNAKEL PIK 2
PROJECT : GEREJA KEMAH TABERNAKEL PIK 2
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO GM Project
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 Play,chiller,escallator
MARCH 2021 TO SEPTEMBER 2021
POSITION COORDINATOR M &E
COMPANY : PT. TATA MULIA NUSANTARA INDAH
PROJECT : MONDELEZ INTERNATIONAL (FACTORY)
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Scope MEP
Electrical,Electronic (CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing (Clean water,Waste water,Hot water, ,Rain water ) FireProtection,WWTP,Compressor system,water cooled chiller,Lift,
Cold storage system
October 2016 TO February2021 POSITION MANAGER M & E
COMPANY : PT. BREWINMESA SUTERA
PROJECT : THE LANA APARTMENT
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO GM Project
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 PLAY
October 2013 TO October2016
POSITION CONSTRUCTION MANAGERM & E
COMPANY : PT. Adhi Persada Properti
PROJECT : GRAND DHIKA CITY BEKASI TIMUR
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO Project Director
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift.
MARCH 2011 TO AUGUST2013
POSITION M & E MANAGER
COMPANY : PT. JAKARTASETIABUDI INTERNATIONAL Tbk
PROJECT : SETIABUDI SKY GARDEN APARTMENT
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO PM
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,
July 2010 TO Dec 2010
POSITION PROJECT ENGINEERING COMPANY : PT. E.K PRIMA
PROJECT : LULU HYPERMARKET
JOB DESCRIPTION
- TECHNICAL SPECIFICATION REVIEW AND RESOLUTION IN PROJECT
- COORDINATION THE COLLECTION AND DISSEMINATION OF TECHNICAL INFORMATION BETWEEN/WITHIN THE COMPANY AND CONSUMER
- SCHEDULE AND MONITORING PROGRAM ACTIVITY TO ACHIEVE AN”ON-
- TIME”RESULT INCLUDINGFOLLOW UP WITH EXTERNAL SUPPLIERS TO ENSURE TIMELY RESPONSE TO ACTION ITEMS
- MONITORING PROGRAM COST ACTIIVITY TO ACHIEVE AN “IN BUDGET” RESULT
- PREPARE QUATATIONS UTILIZING SUPPLIER INFORMATION,COST STANDART,TECHNICAL INFORMATION FROM QUALITY,MANUFACTURING ENGINEERING DESIGN
- ENSURE THAT PROJECTCHARGER ARE CORRECTLY REPRESENTED FOR ACCOUNTING’SCLOSING PROCESS
- PERFORM WORK WHICH INVOLVES CONVENTIONAL METHODS AND TYPE OF PLAN,INVESTIGATIONS,SURVEY,STRUCTURES,OR EQUIPMENTS WITH RELATIVELY FEW COMPLEX FEATURES
- SELECT AND RECOMMENDS PROCEDURES OR DEVELOPMENT OF METHODS
- ASSISTS IN THE COORDINATION OF PRICING,ESTIMATING,SCOPING,STRATEGIES FOR PROPOSEDPROJECTS AND IN THE DEVELOPMENT AND PREPARATION OF TECHNICAL SPECIFICATIONS
- PREPARE DESIGN,DRAWINGS,PLANS AND SPECIFICATIONS FOR PROJECT,ENGINEERING SYSTEM,TECHNICAL EQUIPMENT OR COMPONENTS
- SUPERVISES TECHNICAL TESTING,SURVEY OR FIELD ENGINEERING TEAM
- ASSISTS IN CLIENTCONTACT AND COMUNICATION PERTAINING TO SPECIFIC PROJECTS
- ASSISTS IN PREPARATION OF PROBABLE CONTRUCTION COST ESTIMATES
- PREPARE DESIGN COMPUTATIONS AND QUANTITY ESTIMATES
- ASSISTS IN THE PREPARATION OR MODIFICATION OF REPORTS,SPECIFICATIONS,PLANS,CONSTRUCTION SCHEDULLE,ENVIROMENTAL IMPACTSTUDIES,PERMITS AND DESIGNSFOR PPROJECT
- INSTRUCT TECHNICIANS TO REDUCE DESIGNSTO WORKING DRAWINGS
- REVIEWS AND MONITORSPROJECT PROGRESS TO ASSURE QUALITYAND ADHERENCE TO REQUIREMENTS OF CONTRACT DOCUMENTS
- RECEIVES INSTRUCTIONS ON ASSINMENT OBJECTIVES,COMPLEX FEATURES AND POSSIBLE SOLUTIONS
- RECEIVES/SOLICITSGUIDANCE ON USUAL AND/OR COMPLEXPROBLEMS AND SUPERVISORY APPROVAL ON WORK PLANS
- REPORT TO PM
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator,Showcase,Frozen
Chiller room and Cool Stored,server ,Serverroom,cashier register
SEPTEMBER 2007 TO JUNE 2010
POSITION QUALITYASSURANCE MANAGER and MANAGER MEP COMPANY : PT. MELAWAI JAYA REALTY
PROJECT : BLOK M SQUARE
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO COO
- Scope MEP
Electrical,Electronic (BAS,CCTV,Fire Alarm,MATV,Tlp,Public adress)CHILLER HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator
MARCH 2006 TO SEPTEMBER 2007 POSITION PROJECT MANAGERM & E
COMPANY : PT. PRASETYAGEMA MULIA (FIT OUT PROJECT)
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO DIRECTOR
Project : Wisma Bakrie,Tomen,XL Braga,BI,XL Pondok indah,Rosso
,Shangrilla,Tawan restaurant,Danamon,Minshare,Bellagio food court,Belleza,Prasetya Mulya,BP,Ceo Pacific Place,Indo Food,Danone,Carbon Capital,DATA CENTER
- Scope MEP (FIT OUT MEP SUPORT TO VIVERE)
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data centre,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP ) FireProtection,DATA CENTER
MARCH 2004 TO MARCH 2006 POSITION COORDINATOR M &E
COMPANY : PT. MITRAPRIMA SEJAHTERA
PROJECT : PURI GARDEN APARTMENT
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift
MARCH 2003 TO DECEMBER 2003 POSITION COORDINATOR M & E COMPANY : PT. DECORIENT
PROJECT : SAMPOERNA
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Project : SampoernaProject Sukorejo Pandaan
- Scope MEP
Electrical,Electronic (BAS,CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing (Cleanwater,Waste water,Hot water,STP,Rain water ) FireProtection,Genset,WWTP
APRIL 2002 TO MARCH 2003 POSITION MANAGERENGINEERING
COMPANY : PT. ALUPRIMA PACIFICINDUSTRIES
PROJECT : ALUMUNIUM EXTRUSION CIKANDE
JOB DESCRIPTION :
- PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT
- REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY INDUSTRIES
- SAVING ENERGY PROGRAMAND UTILITY
- COORDINATION CROSS DEPARTEMENT
- IMPROVEMENT PROGRAM ( ZERO BREAK DOWN PROGRAM)
- MODIFICATION MACHINERY EXTRUSION,MELTING,ANODAIZING,OVEN ALUMUNIUM,COOLING TOWER
- REPORT TO PLAN MANAGER
AUGUST 1999 TO APRIL 2002 POSITION CHIEF ENGINEERING
COMPANY : PT. CARREFOURINDONESIA
JOB DESCRIPTION :
- PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT,ENGINEERING
- REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY STORE
- SAVING ENERGY PROGRAMAND UTILITY
- COORDINATION CROSS DEPARTEMENT
- PREVENTIVE MAINTENANCE PROGRAM
- ANNUAL BUDGETING COVERINGCOST LABOUR,UTILITY,SPARE PART AND MAINTENANCE CONTRACT
- ASSET MANAGEMENT INVENTORY
- SUPORT SALES DEPARTMENT
- PROJECT ENGINEER SETTING NEW PROJECT CARREFOUR
- REPORT TO STORE MANAGER CARREFOUR DUTA MERLIN
AUGUST 1995 TO AUGUST 1999 POSITION PROJECT ENGINEERM E COMPANY : PT. BERCA INDONESIA
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT,ENGINEERING AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- COORDINATION SUBORDINATES AND SUBCONTRACTOR TO ACHIEVE THE PROJECT SCHEDULLE
- REPORT TO PROJECT MANAGER
- Project : Wisma Indograha,Anker Bier,Menara 7 Gading Apartement,Permata Berlian Condominium,Carrefour Duta merlin
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator
SEPTEMBER 1993 TO AUGUST1995
POSITION PROJECTENGINEER MECHANICAL
COMPANY : PT. GADJAH TUNGGAL
PROJECT : GADJAH TUNGGAL JATAKE
JOB DESCRIPTION :
- SETTING AND INSTALLATION MACHINERY INDUSTRIES,ENGINEERING
- PROJECT TECHNICAL SUPORT,PERFORMING SITE INSTALLATION AND MAINTENACE MACHINERIES
- CONTROLLING MATERIAL DELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PROJECT ESTIMATION,CONSTRUCTION,DESIGN PLAN SPECIFICATION
- PROJECT DOCUMENTATION AND REPORTING
- PROJECT COST CONTROL
- COORDINATION SUBORDINATES AND SUB CONCRACTOR TO ACHIEVE
- REPORT TO PROJECT MANAGER
Pendidikan
Polytechnic Gadjah Tunggal major Industrial Engineering degree 1993
Profesional dari sektor Teknik / Arsitektur yang sama dengan kris windardjanto
Profesional dari berbagai sektor di dekat Tangerang, Provinsi Banten
Pengguna lain yang disebut kris
Pekerjaan di dekat Tangerang, Provinsi Banten
-
QA Manager, ED
Ditemukan di: beBee S2 ID - 5 hari yang lalu
BASF SE Jakarta, IndonesiaObjectives: · Overseas the activities in the QC and Process Laboratories. · Coordinates and controls the quality management activities in the Polymer Dispersion Plant (PDP). · Main Tasks: · Supervise the release of raw materials and finished products. · Supervise the implementati ...
-
Investment Associate
Ditemukan di: beBee S2 ID - 5 hari yang lalu
Michael Page Indonesia Jakarta, Indonesia Waktu penuhAbout Our Client Our client is a leading investment institution established for the development through strategic investments with coverage both of domestic and international. · Job DescriptionReview and/or create financial models based on potential transaction structures. · Ide ...
-
Marketing Manager
Ditemukan di: beBee S2 ID - 3 hari yang lalu
Michael Page Indonesia Jakarta, Indonesia Waktu penuhAbout Our Client Our client is an established global pharmaceutical company, that highly value advancement in state-of-art technology. They have extensive portfolio in ethical products as well as consumer health and constantly develop new products over the years, covering high-de ...