Tentang kris windardjanto:
Iam 53 years old and Industrial engineering degree
Iam experience at MEP project (High rise building,Data center,Apartment,Office Building,Retail building,mall building,Hotel,Industrial project)
Pengalaman
Jan 2023 TO May 2024
POSITION MANAGER MEPF
COMPANY : PT.FIN CENTERINDO SATU (MEMBER AGUNG SEDAYU GROUP)
PROJECT : MENARA SYARIAH PIK 2 (OFFICE TOWER TWIN TOWER 28 FLOOR)
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO PM Project
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 Play,chiller.
March 2022 TO Nov 2022
POSITION MANAGER M & E
COMPANY : GEREJA KEMAH TABERNAKEL PIK 2
PROJECT : GEREJA KEMAH TABERNAKEL PIK 2
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO GM Project
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 Play,chiller,escallator
MARCH 2021 TO SEPTEMBER 2021
POSITION COORDINATOR M &E
COMPANY : PT. TATA MULIA NUSANTARA INDAH
PROJECT : MONDELEZ INTERNATIONAL (FACTORY)
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Scope MEP
Electrical,Electronic (CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing (Clean water,Waste water,Hot water, ,Rain water ) FireProtection,WWTP,Compressor system,water cooled chiller,Lift,
Cold storage system
October 2016 TO February2021 POSITION MANAGER M & E
COMPANY : PT. BREWINMESA SUTERA
PROJECT : THE LANA APARTMENT
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO GM Project
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,3 PLAY
October 2013 TO October2016
POSITION CONSTRUCTION MANAGERM & E
COMPANY : PT. Adhi Persada Properti
PROJECT : GRAND DHIKA CITY BEKASI TIMUR
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO Project Director
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift.
MARCH 2011 TO AUGUST2013
POSITION M & E MANAGER
COMPANY : PT. JAKARTASETIABUDI INTERNATIONAL Tbk
PROJECT : SETIABUDI SKY GARDEN APARTMENT
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MANPOWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIAL DELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO PM
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,
July 2010 TO Dec 2010
POSITION PROJECT ENGINEERING COMPANY : PT. E.K PRIMA
PROJECT : LULU HYPERMARKET
JOB DESCRIPTION
- TECHNICAL SPECIFICATION REVIEW AND RESOLUTION IN PROJECT
- COORDINATION THE COLLECTION AND DISSEMINATION OF TECHNICAL INFORMATION BETWEEN/WITHIN THE COMPANY AND CONSUMER
- SCHEDULE AND MONITORING PROGRAM ACTIVITY TO ACHIEVE AN”ON-
- TIME”RESULT INCLUDINGFOLLOW UP WITH EXTERNAL SUPPLIERS TO ENSURE TIMELY RESPONSE TO ACTION ITEMS
- MONITORING PROGRAM COST ACTIIVITY TO ACHIEVE AN “IN BUDGET” RESULT
- PREPARE QUATATIONS UTILIZING SUPPLIER INFORMATION,COST STANDART,TECHNICAL INFORMATION FROM QUALITY,MANUFACTURING ENGINEERING DESIGN
- ENSURE THAT PROJECTCHARGER ARE CORRECTLY REPRESENTED FOR ACCOUNTING’SCLOSING PROCESS
- PERFORM WORK WHICH INVOLVES CONVENTIONAL METHODS AND TYPE OF PLAN,INVESTIGATIONS,SURVEY,STRUCTURES,OR EQUIPMENTS WITH RELATIVELY FEW COMPLEX FEATURES
- SELECT AND RECOMMENDS PROCEDURES OR DEVELOPMENT OF METHODS
- ASSISTS IN THE COORDINATION OF PRICING,ESTIMATING,SCOPING,STRATEGIES FOR PROPOSEDPROJECTS AND IN THE DEVELOPMENT AND PREPARATION OF TECHNICAL SPECIFICATIONS
- PREPARE DESIGN,DRAWINGS,PLANS AND SPECIFICATIONS FOR PROJECT,ENGINEERING SYSTEM,TECHNICAL EQUIPMENT OR COMPONENTS
- SUPERVISES TECHNICAL TESTING,SURVEY OR FIELD ENGINEERING TEAM
- ASSISTS IN CLIENTCONTACT AND COMUNICATION PERTAINING TO SPECIFIC PROJECTS
- ASSISTS IN PREPARATION OF PROBABLE CONTRUCTION COST ESTIMATES
- PREPARE DESIGN COMPUTATIONS AND QUANTITY ESTIMATES
- ASSISTS IN THE PREPARATION OR MODIFICATION OF REPORTS,SPECIFICATIONS,PLANS,CONSTRUCTION SCHEDULLE,ENVIROMENTAL IMPACTSTUDIES,PERMITS AND DESIGNSFOR PPROJECT
- INSTRUCT TECHNICIANS TO REDUCE DESIGNSTO WORKING DRAWINGS
- REVIEWS AND MONITORSPROJECT PROGRESS TO ASSURE QUALITYAND ADHERENCE TO REQUIREMENTS OF CONTRACT DOCUMENTS
- RECEIVES INSTRUCTIONS ON ASSINMENT OBJECTIVES,COMPLEX FEATURES AND POSSIBLE SOLUTIONS
- RECEIVES/SOLICITSGUIDANCE ON USUAL AND/OR COMPLEXPROBLEMS AND SUPERVISORY APPROVAL ON WORK PLANS
- REPORT TO PM
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator,Showcase,Frozen
Chiller room and Cool Stored,server ,Serverroom,cashier register
SEPTEMBER 2007 TO JUNE 2010
POSITION QUALITYASSURANCE MANAGER and MANAGER MEP COMPANY : PT. MELAWAI JAYA REALTY
PROJECT : BLOK M SQUARE
JOB DESCRIPTION :
- CONTRACT REVIEW
- DESIGN REVIEWS,VALUE ENGINEERING
- DESIGN VERIFICATION & VALIDATION RECORDS
- DESIGN CHANGES
- THE PROJECT PLAN
- ENGINEERING ( CHECK SHOP DRAWING,CHECK APPROVAL MATERIAL)
- CHECK SCHEDULLE MEP CORELATION WITH MASTER SCHEDULLE
- METHODE STATEMENTS MEP
- INSPECTION & TEST PLANS MEP
- MATERIAL CERTIFICATION/COO (COUNTRY OF ORIGIN)
- INSPECTION REPORT MEP
- COORDINATION WITH CONSULTANT FROM DD TO TENDER DRAWING
- COORDINATION WITH CONTRACTOR,DIRECT CONTRACT,VENDOR
- MONITORING SCHEDULLE,MAN POWER,MATERIAL,MACHINE,MONEY,METHODE
- CORRECTIVE ACTION &PREVENTIVE ACTION REQUEST
- MONITOR LEAD TIME MAJOR EQUIPMENT SCHEDULLE
- TESTING & COMISSIONING DATA
- VALIDATION REPORTS
- QUALIFICATION REPORTS
- AUDIT REPORTS
- QUALITY DOCUMENTATION RECEIVEDFROM SUPLIER/CONTRACTOR
- INSPECTION,MEASURING & TESTING EQUIPMENT CALIBRATION DATA
- INSPECTION,MEASURING & TESTING EQUIPMENTCHECKING RECORS
- DAILY REPORT OF QUALITY ACTIVITAS
- PERIODE QUALITY RECORDS
- QUALITY COST REPORTS
- SAFETY REPORTS
- MINUTES OF METINGATTENDANT BY QUALITYPERSONNEL
- AS BUILT DRAWING
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONSAND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- REPORT TO COO
- Scope MEP
Electrical,Electronic (BAS,CCTV,Fire Alarm,MATV,Tlp,Public adress)CHILLER HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator
MARCH 2006 TO SEPTEMBER 2007 POSITION PROJECT MANAGERM & E
COMPANY : PT. PRASETYAGEMA MULIA (FIT OUT PROJECT)
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO DIRECTOR
Project : Wisma Bakrie,Tomen,XL Braga,BI,XL Pondok indah,Rosso
,Shangrilla,Tawan restaurant,Danamon,Minshare,Bellagio food court,Belleza,Prasetya Mulya,BP,Ceo Pacific Place,Indo Food,Danone,Carbon Capital,DATA CENTER
- Scope MEP (FIT OUT MEP SUPORT TO VIVERE)
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data centre,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP ) FireProtection,DATA CENTER
MARCH 2004 TO MARCH 2006 POSITION COORDINATOR M &E
COMPANY : PT. MITRAPRIMA SEJAHTERA
PROJECT : PURI GARDEN APARTMENT
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAW
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift
MARCH 2003 TO DECEMBER 2003 POSITION COORDINATOR M & E COMPANY : PT. DECORIENT
PROJECT : SAMPOERNA
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- REPORT TO PROJECT MANAGER
- Project : SampoernaProject Sukorejo Pandaan
- Scope MEP
Electrical,Electronic (BAS,CCTV,Fire Alarm,Tlp,Public adress)HVAC,Plumbing (Cleanwater,Waste water,Hot water,STP,Rain water ) FireProtection,Genset,WWTP
APRIL 2002 TO MARCH 2003 POSITION MANAGERENGINEERING
COMPANY : PT. ALUPRIMA PACIFICINDUSTRIES
PROJECT : ALUMUNIUM EXTRUSION CIKANDE
JOB DESCRIPTION :
- PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT
- REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY INDUSTRIES
- SAVING ENERGY PROGRAMAND UTILITY
- COORDINATION CROSS DEPARTEMENT
- IMPROVEMENT PROGRAM ( ZERO BREAK DOWN PROGRAM)
- MODIFICATION MACHINERY EXTRUSION,MELTING,ANODAIZING,OVEN ALUMUNIUM,COOLING TOWER
- REPORT TO PLAN MANAGER
AUGUST 1999 TO APRIL 2002 POSITION CHIEF ENGINEERING
COMPANY : PT. CARREFOURINDONESIA
JOB DESCRIPTION :
- PLANNING,CONTROLLING,COORDINATION,SCHEDULLING MAINTENANCE DEPARTEMENT,ENGINEERING
- REPAIR,OVER HOUL,SERVICES EQUIPMENT,MACHINERY STORE
- SAVING ENERGY PROGRAMAND UTILITY
- COORDINATION CROSS DEPARTEMENT
- PREVENTIVE MAINTENANCE PROGRAM
- ANNUAL BUDGETING COVERINGCOST LABOUR,UTILITY,SPARE PART AND MAINTENANCE CONTRACT
- ASSET MANAGEMENT INVENTORY
- SUPORT SALES DEPARTMENT
- PROJECT ENGINEER SETTING NEW PROJECT CARREFOUR
- REPORT TO STORE MANAGER CARREFOUR DUTA MERLIN
AUGUST 1995 TO AUGUST 1999 POSITION PROJECT ENGINEERM E COMPANY : PT. BERCA INDONESIA
JOB DESCRIPTION :
- PROJECT SITE MANAGEMENT,ENGINEERING AND ADMINISTRATION
- PROJECT SCHEDULLING AND IMPLEMENTATION
- MANAGING MATERIAL,EQUIPMENT,MAN POWER,BASED ON PROJECT SCHEDULLE REQUIREMENT
- ENSURING IMPLEMENTATION OF PROJECT CONSTRUCTIONS DESIGN PLAN AND SPECIFICATION
- DESIGNING PROPER PROJECTORGANIZATION AND DELEGATION
- CONTROLLING THE MATERIALDELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PREPARING PROJECT PROGRESSREPORT AND BILLING
- PREPARING PROJECT HAND OVER AND DOCUMENTATION
- COORDINATION SUBORDINATES AND SUBCONTRACTOR TO ACHIEVE THE PROJECT SCHEDULLE
- REPORT TO PROJECT MANAGER
- Project : Wisma Indograha,Anker Bier,Menara 7 Gading Apartement,Permata Berlian Condominium,Carrefour Duta merlin
- Scope MEP
Electrical,Electronic (BAS,CCTV,Door access,Fire Alarm,MATV,Tlp,Public adress,data,video phone)HVAC,Plumbing (Clean water,Waste water,Hot water, STP,Rain water ) FireProtection,Genset,Lift,Escallator,Travellator
SEPTEMBER 1993 TO AUGUST1995
POSITION PROJECTENGINEER MECHANICAL
COMPANY : PT. GADJAH TUNGGAL
PROJECT : GADJAH TUNGGAL JATAKE
JOB DESCRIPTION :
- SETTING AND INSTALLATION MACHINERY INDUSTRIES,ENGINEERING
- PROJECT TECHNICAL SUPORT,PERFORMING SITE INSTALLATION AND MAINTENACE MACHINERIES
- CONTROLLING MATERIAL DELIVERY,CONSUMPTIONS AND WITHDRAWALS
- PROJECT ESTIMATION,CONSTRUCTION,DESIGN PLAN SPECIFICATION
- PROJECT DOCUMENTATION AND REPORTING
- PROJECT COST CONTROL
- COORDINATION SUBORDINATES AND SUB CONCRACTOR TO ACHIEVE
- REPORT TO PROJECT MANAGER
Pendidikan
Polytechnic Gadjah Tunggal major Industrial Engineering degree 1993