beBee background
Profesional
>
Manufaktur / Mekanik
>
Komplek Panitia Pemilihan Indonesia
Mujiono Dullah Kasan

Mujiono Dullah Kasan

Senior Piping Designer/Checker
Komplek Panitia Pemilihan Indonesia, Jawa Barat
(0)

Sosial


Tentang Mujiono Dullah Kasan:

1.Responsible about his work.

2.Hard workers in the face of difficulties at work.

3.Commitment to the company.

4.Time discipline at work.

5.Respect colleagues and increase self-confidence.

Pengalaman

Mujiono Dullah Kasan

Senior Piping Designer/Checker

Summary

Thirty (30) years of experiences at engineering for Oil and Gas in Onshore and Offshore.

  • 30 - 36 years as Senior Piping Checker..
  • 18 - 30 years as Piping Checker.
  • 11 - 18 years as Senior Piping Designer.
  • 6 - 11 years as Piping Designer.
  • 1 - 6 years as Piping Draftsman.

Responsibilities:

  • Checking Plot Plan and Piping General Arrangement drawings.
  • Provided some information drawings to any discipline. 
  • Incorporating comments of squad check from internal discipline.
  • Checking Pipe Support, Piping Isometric drawings and Piping Material Take off.
  • Checking Wellhead stack-up/Equipment Nozzle orientation asper Vendor drawings and Document of package.
  • Designing Equipment and Piping layout drawings.
  • Designing Equipment Nozzle orientation asper Vendor drawings.
  • Supporting Contractor during construction on site.
  • Site Survey to Onshore and Offshore.
  • To check using Navisworks.

Experience Highlights

  • Feb '23 - Present  at PT. Singgar Mulia Engineering Consultants for assignment to Saipem Indonesia as Senior Piping Designer/Checker. Client – Qatargas Operating Company Ltd. Project – EPC for North Field Production Sustainability Offshore & Pipelines Project. For Wellhead Platform WHP12 North, Riser Platform RP12 North and       Bridge BR12 North.
  • 2021 - 2022  at Serikandi Oilfield Service Sdn Bhd, Brunei as Senior Piping Designer/Checker. Client – Brunei Shell Petroleum Company Sdn Bhd & Brunei LNG Sdn Bhd. Project – Lumut OCP Salt Mitigation, Project – AMDP30 Rejuvenation Detailed Design, Project – CWWJ03 Infill Development Project Detailed Design and Project – Anduki Infill Detailed Design for A5 South OP & A5 South WI. 
  • 2018 - 2020 at Damit WorleyParsons Eng Sdn Bhd, Brunei for assignment to Brunei-LNG as Senior Piping Designer/Checker & Construction support on site. Project – Water battle Plan For Slipstream filters & Cooling towers 3 Cells, 9 Cells, 15 Cells, 16 Cells and Settling ponds, Flocculators, Sand bed filters.
  • 2008 - 2018 at Damit WorleyParsons Eng Sdn Bhd, Brunei as Senior Piping Designer/Checker. Client – Brunei Shell Petroleum Company Sdn Bhd, Brunei LNG Sdn Bhd & TOTAL E & P Borneo BV, Brunei. Project – Glycol System Upgrade Project Champion 7 Train A & B - Detail Design For CPCA07 & CPGP07, Project – AMCX06 Facility Rejuvenation - Conceptual Design, Project – West Pipeline Replacement Project 4 - Detail Design For AMDP02/ AMGP09/ AMPP17/ FACP04/ AMRJ01/FAPP01 & FAPP03, Project – Champion Intermediate Deep – Detail Design For CPCA07/ CPCB07 & CPRP07 and Project – Champion Waterflood – A2 For CPDP-33/ CPRP-04, CPPP-01 Platform, Project – MLJ2 Multi Phase Flow Meter Project, Project – MLJ2-07 Well Connection Project and BLNG Relief Valve Replacement for Train - 1, 3, 4 & 5.  
  • 2005 - 2008 at PT Supraco for assignment to Conoco Philips, Jakarta (Client) as Senior Piping Designer/Checker. Project – Matak, Fire Water System & Fuel Avtur/ Diesel Tanks - Onshore, Project – Ramba, Water Injection on Wellhead, Project – Belida DPPA Platform, Wells Development - Offshore, Project – Hang Tuah Platform, Belanak Gas Filter & Add Pig Receiver and Project – Belida WHPB Platform, Flow line Modification & De Bottlenecking.
  • 2001 - 2005 at PT Technip, Indonesia as Senior Piping Designer/Checker. Client – ConocoPhillips, Indonesia Inc. Ltd, Client – UNOCAL INDONESIA COMPANY, Balikpapan and Client – TOTALFINAELF, Balikpapan. Project Sepinggan Platform 3rd Stage Suction Scrubber Compressor 1A & 1 and Project – Serang Platform Flare Boom Extension, Project – Senipah Compressor Rationalization & Senipah Up-Grade Treatment Capacity, Project – Yakin Central Production Platform-2 Supplement Gas Production and Project – Handil API Barge Replacement.
  • 2000 - 2001 at PT Technip, Indonesia for assignment to Technip Geo Production Malaysia Sdn Bhd. as Senior Piping Designer. Client – PETRONAS PENAPISAN MALAKA SDN. BHD, Malaysia, Client – PETRONAS CARIGALI SDN. BHD, Malaysia and Client – ConocoPhillips, Indonesia Inc. Ltd. Project – Closed Drain System PSR-1,       Project – Dulang A/B infill Drilling pilot and Dulang A water alternative Gas injection and Project – Feed for Belanak Field Development FPSO, Flexible Risers & Subsea Cable.
  • 1998 - 2000 at PT Wirazee Adhi Eng, Jakarta as Senior Piping Designer. Client – YPF MAXUS S.S.B.U, Jakarta. Project – VITA ‘A’ Well Platform & Lidya ‘A’ Well Platform. and Project – Water Handling for Aida ‘A’, Widuri ‘E’, Indri ‘A’ Production Platform and Widuri Process Platform. 
  • 1997 - 1998 at PT Inti Karya Persada Teknik, Jakarta as Senior Piping Designer. Client – BADAK NGL, Bontang, Indonesia. Project – Bontang LNG Project Train-H.  
  • 1996 - 1997 at PT Sofresid Supraco Indonesia, Jakarta as Senior Piping Designer. Client – TOTAL INDONESIE, Jakarta. Project – Total Tunu North Field Development.
  • 1990 -1996 at PT Elnusa (a Subsidiary of PERTAMINA), Jakarta as Senior Piping Designer & Field Engineering. Client – PERTAMINA. Project – Balikpapan Refinery I upgrading, Project – Lembak Prabumulih Oil and Gas,  Gathering Station, Project – Contingency Plan Plaju, Project – Gresik Asphalt Blowing Plan and Project – Balikpapan Refinery II Modification. 
  • 1986 - 1987 at PT Rekayasa Industri CO. LTD, Jakarta as Piping Draftsman. Client – PERTAMINA / BADAK NGL. Project – Badak LP Gas Compressor, Project – Cilacap Paraxylene and Project – Bontang LNG Project Train-E. 
  • 1984 - 1986 at Daelim Industri al LTD, Cilegon - Indonesia as Piping Draftsman. Client – KRAKATAU STEEL. Client – KRAKATAU STEEL.
  • 1982 - 1983 at Fluor Eastern INC, Cilacap - Indonesia as Piping Draftsman. Client – PERTAMINA. Project – Cilacap Refinery Expansion.  

Pendidikan

1878 - 1981 Technical High School - Mechanical in Cilacap - Indonesia

2004              PDMS Training in Jakarta.

1995              Auto CAD Training in Jakarta.

1992              English Course in Jakarta.

1981              Piping Draftsman Training in Cilacap - Indonesia.

Address     : JL. Bahagia, Taman Depok Permai Block A6 No.5 Depok II Timur - Indonesia, 16415.

Profesional dari sektor Manufaktur / Mekanik yang sama dengan Mujiono Dullah Kasan

Profesional dari berbagai sektor di dekat Komplek Panitia Pemilihan Indonesia, Jawa Barat

Pekerjaan di dekat Komplek Panitia Pemilihan Indonesia, Jawa Barat

  • SNS Global Recruiting

    Checker

    5 hari yang lalu

    Langsung berlaku

    SNS Global Recruiting Bandung, Indonesia

    Checker · - Wajib pengalaman di posisi yang sama mínimal 1 tahun terutama di Bidang F&B · - Bisa join segera (ASAP) · "Waspada terhadap Modus Penipuan pada saat proses interview. Perusahaan tidak akan memungut biaya apapun dalam melakukan proses interview. Mohon segera melaporkan ...

  • TRZ

    Fashion Designer

    2 hari yang lalu

    Langsung berlaku

    TRZ Cimahi, Indonesia

    Fashion Designer (FD) · - Pengalaman min 2 tahun di bidang yang sama · - Teliti dan memiliki skill komunikasi yang baik · - Kreatif · - Data menggunakan software yang diperlukan sesuai posisi yang dilamar. · - Domisili : Cimahi & Bandung · "Waspada terhadap Modus Penipuan pada sa ...

  • South Garden Bandung

    Checker

    2 hari yang lalu

    Langsung berlaku

    South Garden Bandung Bandung, Indonesia

    Checker · - FEMALE · - MAXIMUM 27 YEARS OLD · - MINIMUM 3 YEARS EXPERIENCE IN THE SIMILAR POSITION · - EXPERIENCE IN A REPUTABLE RESTAURANT/CLUB/BAR PREFERABLE · - GOOD INTERPERSONAL, TEAMWORK AND COMMUNICATION SKILLS OUTSTANDING CUSTOMER SERVICE · - A NATURALLY POSITIVE OUTLOOK ...